

SAMPLE PROJECT
BASEMENT APARTMENT
Toronto, ON
BASEMENT CONVERSION & SECONDARY UNIT
Conceptual basement conversion exploring a comfortable, functional secondary residential unit.
Sample images and drawings to better illustrate our process.
Project Type
Basement Apartment
LOCATION
Toronto, ON
DESIGN FOCUS
Layout • Building Code • Permit
Status
Sample Concept

PROJECT OVERVIEW
Project Scope
This illustrative concept explores converting an existing basement in Toronto into a functional secondary residential unit. The proposed layout includes an open-concept kitchen and living area, a separate bedroom and a bathroom. The design focuses on natural light, efficient space planning, fire safety and building code considerations.

Coordinating ventilation, heating, drainage and plumbing requirements.
MECHANICAL & PLUMBING
.png)
Considering acoustic separation between the basement and upper dwelling.
SOUND CONTROL

PERMIT & CODE REVIEW
Reviewing applicable Ontario Building Code and municipal approval requirements.

EXISTING CONDITIONS
Reviewing basement dimensions, existing structure and available ceiling height.

SPACE PLANNING
Planning functional kitchen, bedroom, bathroom and living areas.

CEILING HEIGHT
Assessing headroom, beams and ductwork affecting usable living space.

WINDOWS & EGRESS
Reviewing natural light, window openings and applicable emergency escape requirements.

FIRE SEPARATION
Considering required fire protection and separation between dwelling units.
PROJECT CONSIDERATIONS
Key Project Considerations
This illustrative basement apartment concept highlights key building code, safety, layout and permit considerations. Actual requirements depend on existing conditions, the proposed design and applicable regulations.


01
EXISTING CONDITIONS
Review basement layout, ceiling heights, windows, access and existing services.
This illustrative workflow outlines the typical design and permit process for a basement apartment in Toronto. Actual requirements depend on existing conditions, building code compliance and municipal regulations.

FEASIBILITY & CODE REVIEW
02
Assess fire separation, egress, ceiling height and other applicable requirements.
Approval Path

03
PRELIMINARY DESIGN
Develop the kitchen, living, bedroom, bathroom and circulation layout.
APPROVAL PROCESS

04
CONSULTANT COORDINATION
Identify structural, HVAC, plumbing and other required consultant input.

05
PERMIT DRAWINGS
Prepare coordinated architectural drawings and supporting documents.

06
MUNICIPAL REVIEW
Coordinate permit submission and respond to municipal review comments.
PROJECT SERVICES
Typical Project Services
Basement apartment projects typically involve layout planning, code review, permit drawings and coordination with specialized consultants where required.

EXISTING CONDITIONS REVIEW
Review existing basement layout, ceiling heights, windows, access and building conditions.

Permit Coordination
Coordinate permit requirements, municipal review comments and drawing revisions.

BASEMENT LAYOUT DESIGN
Develop a functional secondary suite layout with living, kitchen, bedroom and bathroom areas.

Consultant Coordination
Coordinate with structural, HVAC or other technical consultants where required.

Permit Drawings
Prepare architectural drawings for the proposed basement apartment and related alterations.
PROJECT DOCUMENTATION
Project Drawings & Design

01
Illustrative existing basement layout before conversion into a secondary unit.
EXISTING BASEMENT PLAN

04
EGRESS & SAFETY PLAN
Conceptual plan highlighting exits, windows and fire safety considerations.

02
PROPOSED BASEMENT PLAN
Proposed layout showing the kitchen, living area, bedroom and bathroom.

05
SECTION & ELEVATIONS
Illustrative sections showing ceiling heights, windows and interior finishes.

03
Photorealistic visualization of the proposed basement apartment.
INTERIOR DESIGN VIEW

06
Alternative perspective of the proposed kitchen and living spaces.
3D INTERIOR VIEW
PROJECT OUTCOME
Basement Apartment Design Concept
An illustrative basement conversion concept exploring efficient space planning, natural light, functional living areas and key building code considerations.
CONCEPT STATUS
Concept Study Completed
PHASE
Concept Design
MUNICIPALITY
Toronto
COMPLETION
FEB 2026
